Design / Approval ✓ Approval Granted Design Stages ✓ Concept Design ✓ DA Approval ✓ CC Approval ✓ CDC Approval ✓ Building Contract Signed
Construction ⚒ Under Construction Construction Stages ✓ Demolition ✓ Sitework ✓ Foundation ✓ Hydraulics ✓ Framing(50%) ✓ Roofing ✓ Window Installation ✓ External Cladding ✓ Electrical Rough-in ✓ Plumbing Rough-in ✓ Insulation ✓ Plasterboard Lining
Finishing ★ Not Started Finishing Stages ✓ Interior Fitout ✓ Flooring ✓ Tiling ✓ Cabinetry ✓ Fixtures & Fittings ✓ Final Inspection
Project Information Project Type: Duplex Approval Pathway: CDC Lot Size: 603.9 sqm Total GFA: 402.4 sqm Commencement: 1/12/2025 Project Documents Architectural Plan Structural & Stormwater Engineering Drawings Project Gallery Waffle pod slab Waffle pod slab Under-driveway OSD Completed slab Prefab frames delivery First wall up TV/fireplace wall